Find the top rated cross country skiing trails in Zanesville, whether you're looking for an easy short cross country skiing trail or a long cross country skiing trail, you'll find what you're looking for. Click on a cross country skiing trail below to find trail descriptions, trail maps, photos, and reviews.




















I was on the trail about 2 hours, not the 3 hours I wrote in my previous review. I didn't make that many goofs or explore that much to use an extra hour. (I was riding 3 hours at Blacklick Creek Greenway.)
I rode this trail on October 28, 2026 and enjoyed it. I rode the Foor Leisure Path first and then headed west/left where they met and went toward Three Creeks Metro Park . I stopped where it became the Alum Creek Trail and turned around and headed toward Reynoldsburg. The meandering trail goes through woods, on nice bridges over creeks, under or over roads, past parks and a golf course, through residential area and along busier roads. None of the side streets were busy, so it crossing them went smoothly. I turned around at the end in John F Kennedy Park. I stopped at the Blacklick Woods Metro Park on the way back to climb the Blacklick Woods Canopy Walk. It is a nice place for a break. Restrooms are there, as well as the Nature Center. I took the side spur to Glacier Knoll and then continued back to my vehicle.
At times I stopped to make sure I was on the main trail and not a side spur to a park or residential area, since some were beyond being able to see what was at the end. Signs at those spots would have been nice. If one had the map on an electronic device in view all the time, it wouldn't be a problem. I just have to stop, retrieve it out of my front handle bar bag, turn it on and look. (I don't have room on my handle bars to hold it.)
I enjoyed the trail and would do it again if able. I do live over 2 hours away, so it would take some planning. I recommend the trail.
I rode these trails on October 28, 2026. I did the upper northern one first by parking at the southern end of the Meijer store parking lot. I got on the trail, went north and ended at Busey Rd. It looked like new construction on the street to sidewalk approaches. The southern end curves a bit going past Meijer gas station. A pond can be seen, which made it a bit more interesting than just going alongside a road. Then the trail just ended in the grass.
Then I drove to Goveport Rd where parking is available both sides of the pool. I went east toward the pool, turned onto West St and got to Waterloo St , taking that around until it ended at Gender Rd. Basically it was a wide sidewalk that went past businesses. Returning, I went past my vehicle off Groveport Rd and went west to where it ended at Gender Rd. At least the red line on TrailLink ended. It looked like the sidewalk type trail continued straight and also followed Gender Rd, especially since a bicycle was painted at each corner. I wondered if it would have worked to bike along Gender between Grooveport and Waterloo to make a sort of triangle shaped loop, rather than these out and back along roads. Then I turned around and took the spur south on Thrush Dr. to the Bergstresser Covered Bridge. On the return trip, I went back past my vehicle until I found myself at the Dairy Queen near West and Waterloo for a nice ice cream treat. (I do bike for ice cream!)
I rode this trail on October 27, 2026, starting from the University parking lot. In reading the description, I thought I would constantly be looking at my phone to check where I was and where to go, but I seamlessly went along. (I'm unable to attach the electronic device to my handlebars, so I have to frequently dig it out of my bag, turn it on and look). If going from the university trailhead to the end at Ety Point Dr/Riverway Dr, be careful when getting to Cenci Lake, the main trail goes right and up the small hill. I had goofed and went left.
The trail goes by businesses, through residential areas and connects many parks. Some places were in the open, some places were under or alongside trees. It went under many roads and along water ways. There were porta-pots scattered along the way, mainly in the parks. It was active with people on a great weather Tuesday afternoon in fall when I was there.
The surface on W Main St was rough, but doable. Actually, most of the trail was rough where the roots were causing the asphalt to heave upwards. This would be a great trail if the trail surface was better. (But, probably like many trails, the lack of funds prevents proper maintenance.) The poor surface makes it a 3 star, but it does have potential for improvement.
It took me 3 hours to do the trail out and back biking 20 miles total. (I made a few goofs and had to back track and I explored just a little.)
I biked on this trail on October 27, 2026. I parked at the fairgrounds north of town and on the north end of the trail. Look for the tan colored building with a brown roof (at the time of this writing), which is along the woods, east area of the fairgrounds.
The first part goes across a bridge, through the woods and on crushed limestone up and down a few hills until it meets Front Street. There are a few spots to park there along the road by the bridge. The trail then goes across the road onto a paved trail following the road, all in the open. Finally it turns into Aqueduct Park where there are informational signs on the history of the canal, as well as a pavilion. This area is all grass. On the north or right side of the pavilion are stairs leading down to the creek and a view of the stone culvert. The trail continues on grass, seen on the left side of the pavilion. It ends at the railroad tracks. The whole trail is only a mile, so each surface type isn't long. Walking the trail might be better, but biking is doable.
My wife and I have now ridden this trail twice and the scenery gets more amazing each time. There are nice stopping points along the way as well as rest areas by Kenton College and Howard that have acceptable facilities. We have only ridden from Mt Vernon to Danville, so our next trip will start in Danville
Can't compare to the tie in trails, the Holmes County Trail and Kokosing Gap, which are 5 star trails. Plenty of damaged areas in the asphalt. This time of year the trail has leaves on it so you feel them before seeing them. Very hard on your neck. Plus there is plenty of horse manure on the trail is varying stages of decomposing.
I personally will avoid this stretch of the Ohio Erie Trail from now on.
I returned! I submitted the last review of the parking lot being closed with a photo of the construction and trail closed sign. I had said I wanted to return, and I did, which was on October 21, 2026. I don't know when it opened and it doesn't matter. The trail is great. It was beautiful with the fall colors and sunshine, as well as the rocks, gorge and river along the trail.
Be aware that if you go after a big rainstorm, that the trail might be closed or too risky to continue after a certain point because water in the creek has gone over the trail.
Wow! We had no idea the Ohio to Erie Trail (OTET) would be so memorable. If you’re looking for a multi-day tour with a variety of landscapes, long stretches of trail riding, some great trail towns, urban riding through major cities, and some quiet pedaling through Amish country, then this is a trip for you. The OTET website offers plenty of itinerary options, and the OTET Facebook group has a lot of helpful folks and information. We did an 8 day, credit card tour. We had memorable stays at the London Guest House, the Mount Vernon Inn and the Hotel Millersburg. Our favorite eateries were Red Brick Tavern, Lola’s in Cedarville and Miller’s Creamery in Millersburg. We rate this right behind the GAP on our favorite tours. Highly recommended.
10/9 trail still closed at this intersection. About 2miles north of Lexington. Beautiful ride from Lexington to Butler! Good lunch at Whiffletree Restaurant in Butler.
Wow! What a great little trail! Pavement is in great condition, signage is plentiful, there are numerous services along the route (e.g. picnic tables, trash cans; and restrooms and a drinking fountain at the eastern trailhead) and some pretty nice scenery (Rhines Swamp, etc.). On our late afternoon fall ride, the bird activity was amazing and a coyote crossed the path less than 100 feet in front of us. And easy access to I-77 & US Route 40 made getting there convenient. There was enough parking at the western terminus and the few road crossings we encountered were very low volume traffic, And, as if all that weren't enough, the trail is perfectly flat, as well. We will definitely return.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!