Find the top rated running trails in Mansfield, whether you're looking for an easy short running trail or a long running trail, you'll find what you're looking for. Click on a running trail below to find trail descriptions, trail maps, photos, and reviews.




_249776_st.jpg)










_133078_st.jpg)
_228736_st.jpg)



I am definitely biased, but having this trail a quarter of a mile from my house is a gift. The crushed limestone parts are very smooth and any bike will work. It does get rough for much of the trip. A mountain bike or gravel bike is needed. I have a hardtail mountain bike and that is perfect. I hope in the future they complete the trail with crushed limestone. But if they don't I will still be happy it's there.
I’m a newer rider and decided to ride from Ira trailhead north to Boston Mills. It was about a 14 mile round trip, mostly flat ride. It was absolutely beautiful for a crisp, fall ride! There were some areas of congestion along the way, but most of the ride was quiet and relaxing. I look forward to trying other areas of the trail!
Really love this trail. Mostly shaded and they have ground down the tree roots but could use more road markings and signage at road crossings. The electric bikes and scooters are really becoming a problem.
The trail has been resurfaced and the section up to the Medina Career Center has been paved with asphalt. Trail is in excellent condition. Nice job Medina county!
Holmes County trail has recently been extended an extra 4 miles from the Glenmont trailhead. Killbuck trailhead is now approximately a 3 mile highway ride from the end of this new addition.
Rode out on Old Muskingum. He people, flat quiet, not too much to look at. then back on towpath but closed at Crystal Springs.
I took the trail during the last week in August, starting at the west end. It was trashy under the first bridge just at the beginning, but otherwise the trail was fine. I didn't have any problem seeing the chain link fence.
Views of the Basket Building are best going west, especially when even with the white-roofed greenhouses. Longaberger Basket closed in 2018 and it is now empty.
I could not find the parking lot on the west end as mentioned when I was on the corner of E Main St and S Morris St. I ended up parking at the St Vincent De Paul Thrift Store with permission. If one is going to do the whole route, there is better and obvious parking about midway at Marne and Licking Valley Rd NE as mentioned by others. There is a bike fix-it station less than a minute's ride from that parking lot at the trail side of the church. This would be a good place for a port a pot, since there are no restrooms along the way. The east end doesn't have parking either where the trail just ends.
There are a couple fast food restaurants and a convenience store off the path a couple miles from the west end. Some are at the bottom of a hill, so keep in mind you have to go back up the hill to get on the trail again.
Overall a good trail for the area.
Been awhile since I rode this trail. Started at Ernie’s in Massillon and rode into Dalton. The trail has a noticeable incline going from East to West and the wind is typically from West to East. The 10+ bridges are in good shape. The trail has had some improvements but around the 3 mile mark after riding new asphalt the section of about 3/4 is somewhat bumpy The scenery is nice and both ends of trail have stopping places to eat
We are traveling and today was the only day we had to ride the trail. We entered at the Rockside Station and rode south. About 4 miles in, it started to rain off and on. We were sad because the forecast said 0% chance. Rode on for another few miles. By this time my husband's back was covered in mud from the wet trail and he was chilly, so we turned around and headed back. Total miles ridden was 17, so we only got a small portion but we loved it. So beautiful with yellow wildflowers all around. Informative historical signs tell you about the Erie Canal and life on the canal. Neat. I wish we could have ridden the train and then biked back, but we found out it doesn't run on Monday and Tuesday, and guess when we were here, yup Monday and Tuesday. If we are ever back in the area we would definitely ride it again!
I am thankful for the reviews as I was able to ride the grassy section to add a few miles. I did the county line trail before this one, between the two I managed to do 20 miles with a 7 mile car ride between the trails. Maybe I will live long enough to see and ride the completion of this trail system.
We parked on the West side of Norwalk and biked almost to Bellevue and back. Trail surface is crushed limestone in iffy condition. Seen better, seen worse. It was hot out, not much shade. Historic restored train station and park in Monroeville was kind of nice. We ate in Norwalk at a place called Berrys restaurant on the main drag. Can reach by bike. Then we loaded up and headed to the other side of the town where the trail goes towards Wakeman. That section of the trail is also crushed limestone seen better, seen worse. More open farmlands over that way a few areas of shade. Pretty scenery. We can now say we've completed the entire NCIT all 100ish miles of it through 3 counties.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!