Find the top rated wheelchair accessible trails in Norton, whether you're looking for an easy short wheelchair accessible trail or a long wheelchair accessible trail, you'll find what you're looking for. Click on a wheelchair accessible trail below to find trail descriptions, trail maps, photos, and reviews.







_249776_st.jpg)
_277990_st.jpg)





_172671_st.jpg)





We travel almost 2 hours to get to this trail and worth the drive. One of Ohio's nicest trails. Asphalt paved in very good condition, pretty scenery, well maintained by Geauga County Parks, numerous benches along the route, grass cut, trash cans emptied and nice restrooms. There are 5 covered bridges along the trail. Most of the trail is full sun so make sure you slather up with sunscreen on a sunny day. We parked at Headwaters Park and biked up to Chardon for lunch and back. Then biked down to Middlefield. Total miles 30 round trip. Was sad to see the fountain at the Middlefield end of the trail was not working and the trellis removed and no hanging flower baskets.
We really enjoyed this trail. It checked all the boxes for me!! It was mostly shady with trees/woods lining most of the trail, benches to rest, flat, no hills, 14 total miles, lovely scenery, a train track running along side, and a small town at the end of the trail head to shop or eat. Even though it had rough gravel in spots, knowing it is still being worked on, I give it a 5/5. When the trail is completed I think it will be near perfect. We started in Greenwich and ended in New London. We rode around town and found the beautiful New London Recreation Park at 2 Blake St. We had a nice picnic and the park had very clean bathrooms. A horse arena was built there in 2025, and as our extra bonus, they happened to be having an event that day. I love riding bikes, but sometimes the best part of the trails are the surprises you'll find along the way,
We biked on this trail coming seamlessly off the Metro Parks trail. This trail begins at Countyline....the Mahoning and Trumbull County lines. Trail is asphalt paved in good condition. One busy road crossing just below Meander Reservoir. At the Niles trailhead the trail extends 2/10 of a mile over at least one bridge. Eventually it will connect with the Western Reserve Trail in Warren.
We parked in Orwell and biked South to Bristolville and turned around. Then back to Orwell for lunch at the Mexican restaurant along the trail. Great food and service with outdoor seating. They will also fill your water bottles with water and ice. After lunch we headed North to Rock Spring. Total 36 miles round trip. This trail is virtually flat as well as straight. Most of it is very well shaded. Trail in very good paved condition though between Oakfield and Bristol a stretch about 1/10 of a mile with some kind of speed bumps every 20 feet. We are not sure what the purpose of that is, they are marked with paint. If you can just overlook that, the rest of the trail is super!
First time for riding the Conotton creek trail and we really liked it. The best place to park is on the Jewett end. Nice and flat, pavement in great shape and bathrooms long the way. We will definitely ride this trail again.
We biked from Glenmont to Brinkhaven. Coming out of Glenmont it's a 3 1/2 mile uphill climb to Baddow Pass. Then 4 miles downhill the other side where it levels off before going under Route 62. We stayed on the trail to connect seamlessly to the Mohican Valley Trail. Pan Ohio Hope American Cancer Society was having their annual ride that day and we saw some riders. The trail is in very good paved condition.
We accessed this trail from the Holmes County line. Seamless connection onto the Mohican Valley Trail at the Knox County line in Brinkhaven. Surface is paved in good condition. Trail is shared with Amish horse & buggy's. This is a great connection between the Holmes County Trail and the Kokosing Gap trail in Danville.
This "trail" is made up of many smaller trails and some of it is on roads. Do as much research on this as you can before your trip!
Nice community trail that links to a beautiful park for kids. Nice ride if you’re in the neighborhood.
Since our last visit in 2022 they recently have repaired the ruts and potholes. Not a complete repave but a good job fixing up the mess. But from Holmesville to Fredericksburg there still are some cracks with grass growing up and a rut down the middle so stay to the side. This trail is a thruway for the locals to get from town to town. Heavy traffic even on a weekday. Didn't see many regular manual pedal bikes or even pedal assist but large class ebikes and scooters and some as large as small motorcycles. They sound like golf carts when passing using their throttles. It's not a very quiet and relaxing trail. The speed limit is supposed to be 20 mph that's a joke because if these "machines" can reach speeds beyond that, then the trail users are gonna use all the power they have. Only saw one Amish horse and buggy. I know they're out there because they already chewed up the new pavement sections that have been recently repaired. Most of the trail is shaded. At the Killbuck end construction workers are working on the trail segment thru town. We biked Fredericksburg to Killbuck and back, 30 mile round trip. Several parking areas along the way.
Hats off to Portage County for repaving last year and redoing the RR crossing near Ravenna. Whether it was the RR or the County you did a fantastic job on a hazardous crossing. Very nice trail. Hopefully it gets extended east
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!